All demos
Live demo · sample data
A production line on screen
Start the line, cause a jam at station 2 and bring it back to work, like an operator.
Shift time runs faster: 1 second on screen is 6 seconds of the shift.
What it proves
Logic like a controller program: sensors, counters, interlocks, an alarm log with time, acknowledgement and recalculated output and downtime.
Built with
JavaScript and SVG, a 100 ms scan cycle like a controller. Everything runs in the browser, the numbers are invented.
What the sample can’t do
A training line without real equipment. In a project the screen connects to the line controller and writes history to a database.
Need something like this for your business?
We reply by email with questions or a plan for the diagnosis.